Three Phase Y2-100L2-4 Election Motor with High Quality

Y2 collection 3-stage Asynchronous Induction Motor

 

Ambient temperature: -15ºC < Θ < 40ºC
Altitude: not exceeding 1000m
Rated voltage: 380V or any voltage between 220-760V
Rated frequency: 50HZ,60HZ
Defense class: IP54/IP55
Insulation class: F,H
Cooling strategy: ICO141
Duty:S1 (steady)
Connection: CZPT-relationship for up to 3kw, delta-link for 4kw and earlier mentioned.

CZPT Info
 

Type Electrical power (kw) Pace
(r/min)
Present IN(A) Eff.  (%) Energy Issue Ist/Tn Tst/Tn  
Synchronous Pace 3000 rpm
Y2-63M1-2 .18 2720 .53 65 .eighty 5.five two.two two.2
Y2-63M2-two .twenty five .69 sixty eight .eighty one
Y2-71M1-two .37 2740 .99 70 .81 six.1
Y2-71M2-2 .55 1.40 73 .82 two.3
Y2-80M1-2 .75 2835 one.eighty three seventy seven.four .eighty three
Y2-80M2-two one.one two.58 seventy nine.six .84 seven.
Y2-90S-2 1.five 2845 3.43 81.three
Y2-90L-two two.two four.85 eighty three.2 .85
Y2-100L-two 3. 2875 six.31 eighty four.six .87 seven.five
Y2-112M-two 4. 2895 eight.10 eighty five.8 .88
Y2-132S1-2 5.5 2905 eleven. 87.
Y2-132S2-2 7.five fourteen.nine 88.one
Y2-160M1-2 eleven 2935 21.three 89.four .89
Y2-160M2-two fifteen 28.8 90.three
Y2-160L-two eighteen.5 34.seven ninety.nine .90
Y2-180M-2 22 2945 41. ninety one.three two.
Y2-200L1-two thirty 2955 fifty five.five 92.
Y2-200L2-2 37 67.nine ninety two.5
Y2-225M-two forty five 2975 82.three ninety two.nine
Y2-250M-two 55 101 ninety three.2
Y2-280S-2 seventy five 134 93.eight
Y2-280M-two 90 160 ninety four.1 .ninety one
Y2-315S-two one hundred ten 2980 195 94.3 seven.1 1.8 2.2
Y2-315M-2 132 233 94.6
Y2-315L1-2 one hundred sixty 279 94.8 .ninety two
Y2-315L2-two two hundred 348 95.
Y2-355M-two 250 433 95. 1.six
Y2-355L-2 315 544 95.
Synchronous Speed 1500 rpm
Y2-63M1-four .twelve 1310 .forty four fifty seven .seventy two four.four two.one two.2
Y2-63M2-four .eighteen .sixty two sixty .seventy three
Y2-71M1-4 .25 1330 .79 sixty five .75 five.two
Y2-71M2-four .37 one.12 67 .seventy four
Y2-80M1-four .55 1395 one.fifty seven 71 .seventy five two.4 2.three
Y2-80M2-4 .75 two.03 seventy nine.6 .76 6. 2.three
Y2-90S-four 1.one 1405 two.89 81.four .77
Y2-90L-four one.five three.70 eighty two.eight .79
Y2-100L1-four 2.two 1435 5.sixteen 84.3 .eighty one 7.
Y2-100L2-4 three. six.seventy eight 85.five .eighty two
Y2-112M-four 4. 1445 eight.80 86.six
Y2-132S-four five.5 11.7 87.seven .83
Y2-132M-4 seven.five 15.6 88.seven .eighty four
Y2-160M-four eleven 1465 22.3 89.eight 2.2
Y2-160L-4 15 thirty.1 90.six .85 seven.five
Y2-180M-4 18.five 1475 36.5 ninety one.2 .86
Y2-180L-four 22 43.2 ninety one.six
Y2-200L-four thirty fifty seven.6 ninety two.3 seven.two
Y2-225S-4 37 1485 sixty nine.nine 92.seven .87
Y2-225M-four 45 84.seven ninety three.one
Y2-250M-four fifty five 103 ninety three.5
Y2-280S-four 75 one hundred forty ninety four.
Y2-280M-4 90 1490 167 94.two
Y2-315S-4 110 201 94.5 .88 6.9 2.one 2.two
Y2-315M-4 132 240 94.seven
Y2-315L1-four a hundred and sixty 287 94.9 .89
Y2-315L2-four two hundred 359 95.one
Y2-355M-4 250 1485 443 95.1 .ninety
Y2-355L-four 315 556 95.1

Kind Energy (kw) Velocity
(r/min)
Present IN(A) Eff.  (%) Energy Factor Ist/Tn Tst/Tn  
Synchronous Velocity 3000 rpm
Y2-71M1-six .eighteen 850 .74 fifty six .sixty six 4. 1.9 two.
Y2-71M2-6 .twenty five .ninety five 59 .sixty eight
Y2-80M1-six .37 895 one.30 62 .70 four.seven
Y2-80M2-six .fifty five 1.seventy nine sixty five .seventy two two.1
Y2-90S-six .seventy five 915 2.29 75.9 five.five 2.
Y2-90L-6 one.1 three.eighteen 78.one .seventy three
Y2-100L-six one.5 945 three.94 seventy nine.eight .75
Y2-112M-six 2.2 five.60 eighty one.8 .seventy six 6.5
Y2-132S-six three. 965 7.forty 83.3 two.1
Y2-132M1-6 4. nine.80 84.six
Y2-132M2-six 5.five twelve.9 86. .77
Y2-160M-six 7.five 975 17. 87.two .seventy eight 2.
Y2-160L-6 11 24.2 88.seven .eighty one seven.
Y2-180L-six 15 31.6 89.7
Y2-200L1-6 18.5 38.6 ninety.4 .83 two.1
Y2-200L2-6 22 forty four.7 ninety.nine .84
Y2-225M-6 thirty 985 fifty nine.three 91.7 .86 two.
Y2-250M-six 37 71. ninety two.two 2.1
Y2-280S-six 45 86. ninety two.7 2.
Y2-280M-six 55 one hundred and five ninety three.1
Y2-315S-six 75 990 141 93.7 2.
Y2-315M-6 90 169 94.
Y2-315L1-six one hundred ten 206 94.three six.seven
Y2-315L2-6 132 244 94.six .87
Y2-355M1-6 one hundred sixty 292 ninety four.8 .88 one.nine
Y2-355M2-6 two hundred 365 95.
Y2-355L-six 250 455 95.
Synchronous Pace 750 rpm
Y2-80M1-eight .18 630 .88 51 .sixty one 3.three one.8 1.nine
Y2-80M2-8 .25 640 1.15 fifty four
Y2-90S-eight .37 660 1.forty nine 62 four.
Y2-90L-eight .55 two.18 63 two.
Y2-100L1-8 .75 680 two.39 seventy one .67
Y2-100L2-8 1.1 three.32 73 .69 five.
Y2-112M-eight one.5 690 4.50 75
Y2-132S-8 2.two 710 6.00 seventy eight .seventy one six.
Y2-132M-eight 3. 7.90 79 .seventy three
Y2-160M1-8 four. 720 10.3 81 1.9
Y2-160M2-8 five.5 thirteen.6 83 .seventy four 2.
Y2-160L-eight seven.five 17.8 85.five .seventy five
Y2-180L-8 eleven 730 25.1 87.five .76 six.six
Y2-200L-eight 15 34.one 88
Y2-225S-8 eighteen.5 40.six ninety one.nine
Y2-225M-eight 22 740 forty seven.4 90.5 .78
Y2-250M-eight 30 sixty four. 91 .seventy nine
Y2-280S-eight 37 seventy eight. ninety one.five
Y2-280M-eight forty five 94. ninety two
Y2-315S-eight 55 111 92.8 .eighty one 1.8
Y2-315M-eight seventy five 151 93
Y2-315L1-eight ninety   178 93.8 .82
Y2-315L2-eight one hundred ten   217 ninety four seven.2
Y2-355M1-eight 132   261 93.7
Y2-355M2-8 one hundred sixty   315 ninety four.two
Y2-355L-8 200   388 ninety four.5 .83
Synchronous Pace 600 rpm
Y2-315S-10 45 590 a hundred ninety one.5 .seventy five 6.2 one.5 2.
Y2-315M-ten fifty five 121 92
Y2-315L1-ten seventy five 162 ninety two.five .seventy six
Y2-315L2-ten 90 191 93 .seventy seven
Y2-355M1-ten 110 230 ninety three.2 .78 6. 1.3
Y2-355M2-10 132 275 ninety three.5
Y2-355L-10 one hundred sixty 334 93.5

FAQ
 
Q: What is your MOQ of this product?
A: Our MOQ is a full 20ft container, but for the 1st time cooperation, we accept demo sample buy is OK to verify high quality.
 
Q: Is it all appropriate to make customers’own brand title?
A: Positive, we can be your OEM manufacturer with your authorization of brand.
 
Q: What are your payment conditions? 
A: thirty% T/T deposit, 70% harmony just before cargo or L/C at sight.
 
Q: How prolonged is your guarantee?
A: One 12 months after acquire B/L.
 
Q: What is the shipping and delivery time?
A: twenty five-30 days after acquiring your L/C or T/T deposit.

Three Phase Y2-100L2-4 Election Motor with High Quality